       entire lifecycle of a building, from the extraction   insulation. “There are quality controls at each   “We anticipate the reforms»
       of raw materials to the transport and distribution   stage of the work,” notes the MPG Environment   On the 70-square-metre roof, thermal solar
       of these materials before construction, until   Manager.            panels have been installed, producing 46% of
       the end of the building’s life, including the                       domestic hot water needs; and other solutions
       recycling of materials and, of course, passing   A geothermal loop dug with 40 boreholes of   improve energy performance: presence detection
       through the site and construction phase, with   250 metres          systems to control lighting in common areas,
       the challenge of waste management; but also   Part of the arsenal of this 86-metre tower is   low-consumption sources (LED) for collective
       through the operation of the building. “We try   a geothermal loop system, providing 100%   lighting, automatic watering of green spaces
       to have a global and pragmatic approach. We   of the heating and cooling for the building   controlled by a weather station and selective
       operate a technological watch and choose   through the use of active floor slabs. “This   sorting of waste for each storey: “We are going
       suitable materials (such as low-carbon concrete)   is the only loop system of this dimension in   beyond French and Monégasque regulations.
       for the construction; we seek technological   Monaco which allows you to be autonomous.   We anticipate the changes and reforms, drawing
       solutions that can easily be adopted by the users   On the technical level, it was necessary to   inspiration from the most advanced countries,”
       of the building, whether they be residents or   drill 40 holes of 250 metres and place 10,000   stresses Serge Ginesy, for whom, “It is imperative
       technical teams, in order to optimise its energy   metres of probes in the drilling holes! It is a very   always to be one step ahead.”
       performance. A home automation interface,   technical operation, carried out by specialists.
       placed in each apartment, thus makes it possible   This requires a lot of monitoring, because
       to control heating, air conditioning and lighting   it is necessary, in particular, to manage the   “Monaco pushes us
       installations and encourages virtuous behaviour.”  crossing of the underground water table without   to be innovative”
                                         causing pollution,” observes Serge Ginesy. The
       BREEAM-certified operation        advantage of active floor slabs is “to benefit   Architectural verticality and the use of
       The group’s latest building, the MoNa Residence,   from the inertia of the building and to benefit   glass in a tower appear at first glance
       designed by Jean-Michel Wilmotte and the   from a low-emission temperature regime,   to be anything but ecological – but
       Rainier Boisson office in Monaco. “It was   ranging from 18° in cooling to 28° in heating.”   what is the reality? “Nothing is all white
       built deliberately to comply with the BREEAM   Other solutions have been integrated in order to   or all black,” evaluates Serge Ginesy. “In
       certification process and has achieved the   limit the summer heat: sliding sunshades on the   Monaco, the surface area is limited and
       Excellent Label. This is the first collective   balconies and adjustable sunshades integrated   the possibilities for expansion at sea
       housing construction project in continental   into the joinery of the bay windows, argon-filled   are not endless. We need verticality and
       Europe to have subscribed to this programme,”   double glazing and even thermal break window   that pushes us to be innovative! We can
       explains Aïleen Fabre, Commercial Director   barriers. “The balconies themselves on each   also pool the energy performance in a
       of the Centre Immobilier Pastor real estate   floor serve as protection for the floor below.   tower for all residents, thanks to a high-
       centre. This is a certification that guarantees   This reduces summer discomfort with a PPD   performance system. In comparison with
       the building limits the production of greenhouse   of less than 10% (percentage of people finding   individual homes with the same number
       gases through the use of renewable energies   the environment uncomfortable), without even   of inhabitants, there is less energy loss
       and offers high performance in terms of thermal   adding air conditioning!” declares Serge Ginesy.  in a building.”














        Le hall abrite une création artistique
         géométrique signée Ora-ïto / Daniel
         Buren. Pendant 12 semaines, près
        de 2000 pièces de marbre aux motifs
         différents (marbre vert des Alpes,
          marbre blanc Calacatta Caldia),
               ont été assemblées.
        The hall houses a geometric artistic
          creation by Ora-ïto/Daniel Buren.
         Over the space of 12 weeks, nearly
        2,000 pieces of marble with different                                                              © Centre Immobilier Pastor
         patterns were assembled, including
        green marble from the Alps and white
             Calacatta Caldia marble.